- How can a planning version be frozen and unfrozen? …
- What is Release Profile? …
- What is the usage of Period Factor? …
- What determines stock categories displayed in Stock on Hand keyfigure? …
- Does dynamic alerts show up in Alert Monitor? …
- What is the report to execute MASSD?
In SAP APO, Production Planning/Detailed Scheduling (PP/DS) is used to generate procurement proposals to meet the production requirements. This component is also used for defining resource plan and order details. You can also plan for critical products to reduce the lead time and to improve time delivery performance.
PP/DS is integrated with other SAP APO components. For example, with demand planning to create a demand plan and to move PIR to PP/DS to create procurement proposals.
Transaction and master data from the OLAP system is moved to APO and after order processing planning, results are moved to APO system.
SAP APO PPDS Tutorial || SAP APO PPDS Training || Production Planning and Detailed Scheduling
SAP APO Interview Questions and Answers
A Planning Version can be frozen and unfrozen using Function Module /SAPAPO/TS_PAREA_VERSIO_FREEZE so that no further changes to the planning version can be done.
What is Release Profile?
Release Profile is used to release timeseries data from DP to SNP/PPDS. You need to define the DP Planning Area and time series key figure the data in which is released and the SNP Category Type (typically FA) to which data is released. You may maintain a Daily Buckets Profile it will define the number of working days (working days determined based on Shipping Calendar maintained for the location master) starting on and from the From Date if released online/ interactively or that many workdays of the planning horizon when release is carried out in the background. The Period Split (blank, 1 and 2) field in the SNP2 tab of the location-product master determines how the demand plan is released to SNP from DP (how bucketed data is disaggregated to the workdays).
Answer: – If you want to use two tables on a single screen for Planning Data View/ Book
Suppose you want to get more information on the SAP APO training. In that case, you can visit the Cloudfoundation website and get in touch with their team.
It is a schematic that shows all the entities within the scope of integration and the direct relationship between entities.
Answer: – With the use of the function module, the Planning version can be frozen or unfrozen.
Answer: – In the Product Heuristic, the Reuse mode makes the system reuse the orders present already in the heuristic run, which means the orders are not recreated and deleted.
With SAP APO you have a real-time integration to SAP R/3. The minute you change something in one system, it is immediately being transferred to the other and vice versa. And that goes for all data, be it a sales order, a production order or a purchase order. You do not have to perform any batch jobs for transferring data between the systems.
To copy a process chain to another process chain, goto the Process Chain you want to copy and then type copy in the tool tar and hit enter. It will allow you to copy the Process Chain to another Process Chain that can be modified as per users requirement, saved, activated and used.
Period Factor maintained in the SNP PPM or Transportation Lane determines the Availability Date of a Receipt element within a time bucket (period). The system determines the exact availability date/time of the receipt elements within a period, by adding a time interval (that it gets by multiplying the period factor with the period length) to the start time of the period. You can enter a factor between 0 and 1, where 0 is the start of the period, 0.5 the middle, and 1 the end of the period. When calculating the availability date/time, the system takes into consideration all weekdays, meaning that it does not take into consideration any days that have been defined as non-workdays in the calendars.
Through the APO Core Interface (CIF) which supplies SAP APO with master and transaction data in real time. CIF is delivered through the R/3 Plug-In, which is something you have to install in your SAP R/3 system. This is the same Plug-In that you need for connecting a BW or a CRM system.
Release Profile is used to release timeseries data from DP to SNP/PPDS. You need to define the DP Planning Area and timeseries keyfigure the data in which is released and the SNP Category Type (typically FA) to which data is released. You may maintain a Daily Buckets Profile it will define the number of working days (working days determined based on Shipping Calendar maintained for the location master) starting on and from the From Date if released online/ interactively or that many workdays of the planning horizon when release is carried out in background. The Period Split (blank, 1 and 2) field in the SNP2 tab of location-product master determines how demand plan is released to SNP from DP (how bucketed data is disaggregated to the workdays).
FAQ
What is PPDS in SAP APO?
What is APO system in SAP?
What is Apo process?